// Medium-voltage switchgear

MV Switchgear

VCB metal-clad switchgear and load-interrupter switchgear. Arc-resistant options, relay packages, and close-coupling to Bet Power substation transformers.

global manufacturing
Relay & protection
20 – 24 week lead times
1 year warranty
MV Switchgear
Overview

Protection engineered, lineup coordinated, shipped as one.

MV switchgear is quoted with the transformer, not after it. One engineer owns the lineup, bus ratings, throat dimensions, and relay settings, so the package lands ready to bolt together.

Startup and relay commissioning are performed by BET Power field service under the same warranty as the equipment.

< 30 minQuote turnaround
38 kVMaximum voltage class
63 kAMaximum interrupting rating
Key specifications
  • Voltage5 – 38 kV class
  • Bus rating1200 – 4000 A
  • Interrupting25 – 63 kA
  • TypesMetal-clad (IEEE C37.20.2), metal-enclosed (C37.20.3), pad-mounted (C37.74)
  • BreakersVacuum, draw-out or fixed
  • StandardsIEEE C37.20.2 / .3, C37.04, C37.09, UL / cUL options
  • Lead timeBuilt to order: 20 – 24 weeks
Specifications

What ships standard. What you can add.

Every unit is built from your spec. The lists below are the baseline and the most common options; anything else, send the drawing.

Standard specifications

Included on every mv switchgear order.

  • Draw-out vacuum circuit breakers
  • Copper bus, epoxy insulated
  • Microprocessor protective relays
  • Current & voltage transformers
  • Key interlocks & shutters
  • Ground bus, full length
  • Indoor NEMA 1 enclosure
  • Control power transformer
  • Heaters & thermostats
  • Factory production tests per IEEE C37.20.2
  • Mimic bus & nameplates
  • ANSI 61 gray finish

Optional specifications

Quoted line by line, no packages.

  • Arc-resistant construction (Type 2B)
  • Outdoor walk-in or non-walk-in aisle
  • Close-coupled transformer throat
  • Automatic transfer (main-tie-main)
  • Partial discharge & thermal monitoring
  • Remote racking
  • Surge arresters
  • SCADA / DNP3 / IEC 61850 communications
  • Seismic qualification
From spec to energization

Five steps. Five teams.

A dedicated team owns each stage, from the first quote through the life of the unit.

01Sales

Request or build your quote

Send a spec or use Build a Quote. Pricing back in less than 30 minutes.

02Engineering

Start drawings

Our engineering team turns the quote into approval drawings and submittals.

03Project Management

Weekly build updates

Your project manager reports manufacturing progress every week until it ships.

04Logistics

Coordinate delivery

In-house logistics desk, staffed 24/7, schedules boats, trucks, and delivery timelines.

05Post-Sales

Commission and support

Post-sales team on call through installation, commissioning, and the life of the unit.

Send us a spec. Get a number back today.

MV Switchgear quoted in under 30 minutes. Built for speed, priced for reality.