Industrial power

Plant power without the 40-week wait.

Unit substations, 5 – 38 kV switchgear, UL 891 switchboards, and panelboards for plants, mills, and process facilities. Stock ships in days.

10 MVALargest unit substation
6000 ALargest UL 891 switchboard
DaysStock lead time
ExxonMobil
Graybar
Phillips 66
Wholesale Electric Supply
Valero
Elliott Electric Supply
Motiva
City Electric Supply
Wholesale Electric Supply Co. of Houston

What we do for industrial

Equipment to keep our industrial processes going.

The same desk prices the transformer, the switchgear, the switchboard, and the panelboards.

01Unit Substation Packages

MV transformers, UL891 Switchboards, and MV Switchgear on a skidded solution.

  • 500 – 2500 kVA, primary to 34.5 kV, secondary to 480Y/277 V .
  • Dry-type or liquid-filled, indoor or outdoor.
  • Shipped as a matched package with one set of approval drawings.
See Padmount Transformers

02Plant distribution

Switchboards and panelboards for the floor, the unit, and the office.

  • UL 891 switchboards 800 – 6000 A, up to 600 V.
  • Panelboards 100 – 1200 A, bolt-on or plug-in breakers.
  • Stock panelboards ship in days, built-to-order 4 – 8 weeks.
See UL 891 switchboards

03Quality Components

We strive to use best-in-class components to makeup our equipment sets.

  • Qualitrol gauges and accessories.
  • SEL-751 Relays.
  • ABB and Siemens distribution breakers.
Build a Quote

Typical spec

The spec we see most.

Most industrial RFQs land inside these ranges. Send yours and we confirm the number, the origin, and the ship date in one reply.

Unit substation
750 – 3000 kVA, close-coupled, indoor
Primary
4.16 – 13.8 kV, up to 34.5 kV
Secondary
480Y/277 V, 4160 V for large motor loads
Switchgear
5 – 15 kV metal-clad, 1200 – 2000 A
Switchboard
UL 891, 2000 – 4000 A, 65 – 100 kAIC
Panelboards
100 – 1200 A, 480Y/277 V and 208Y/120 V
Standards
IEEE C57.12.00, UL 891, UL 67, NEMA 1 / 3R / 12

Ranges shown are the common asks. Anything outside them is quoted the same way, in under 30 minutes.

Why BET Power

Built for the plant schedule.

Downtime is priced by the hour. The equipment that ends it should not be priced by the quarter.

  • SalesSend the one-line or the nameplate for a quick quote.
  • EngineeringOur engineers turn the quote into approval drawings and submittals.
  • Projects Your project manager reports manufacturing progress every week until the unit ships.
  • LogisticsIn-house desk schedules boats, trucks, and delivery windows.
  • Post SalesBET Power owns startup, testing, and warranty support.

Customer stories

Numbers from the field.

Outcomes from plants that needed power on the floor without a 40-week gap.

Custom engineered 12.47 kV unit substation skid built by BET Power, installed in West Texas

MV-LV Skid

Custom engineered 12.47 kV Unit-Sub Skid in West Texas.

16 Weeks delivered, all built locally in Beaumont, TX.

Like-for-like replacement unit substation and switchgear enclosures installed outside an industrial plant

Industrial package

Expedited Switchboard Package

Bet Power delivered UL891 Switchboards in just 4 weeks for a tight turnaround when a project hit delays with the original option.

Let's build together, Today.