Data center power

Powering the Future.

Padmounts, unit substations, MV switchgear, and UL 891 switchboards for hyperscale and colocation builds. Shipped from stock or built to your one-line.

< 30 minQuote turnaround
2500 kVAMost-requested padmount
DaysStock lead time
Nvidia
Graybar
AMD
Supermicro
Miami International Airport
City Electric Supply
Galaxy
Galaxy
Wholesale Electric Supply

What we do for data centers

From Line to Load.

Every stage, from the utility handoff, to the GPU rack, is priced by Bet.

01Site power and distribution

Loop-feed padmounts sized to the campus one-line.

  • 2500 – 3750 kVA padmounts, 480Y/277 V secondary, loop or radial feed.
  • 15 kV metal-clad switchgear: main-tie-main, feeder sections, utility metering.
  • Approval drawings within days of PO, revisions handled by the same engineer.
See Padmount Transformers

02Quality Components

We strive to use best-in-class components to make up our equipment sets.

  • Qualitrol gauges and accessories.
  • SEL-751 Relays.
  • ABB and Siemens distribution breakers.
Build a Quote

03Startup, testing, and warranty

Our field team supports on energization.

  • Factory test reports and origin paperwork in the submittal packet.
  • On-site startup and commissioning support on your schedule.
  • Equipment Installation, Operation, and Maintenance Manuals provided with delivery.
See Documentation

Typical spec

The spec we see most.

Most data center RFQs land inside these ranges. Send yours and we confirm the number, the origin, and the ship date in one reply.

Transformer
2500 – 3750 kVA padmount, liquid-filled, loop feed
Primary
12.47 – 34.5 kV, dead-front, 200 A loadbreak
Secondary
480Y/277 V
Switchgear
15 kV metal-clad, main-tie-main, 1200 – 3000 A
Switchboard
UL 891, 4000 A, 100 kAIC, service entrance rated
Standards
IEEE C57.12.34, IEEE C37.20.2, UL 891, NEMA 3R
Origin
Leveraging a global manufacturing base, both domestic, and international

Ranges shown are the common asks. Anything outside them is quoted the same way, in under 30 minutes.

Why BET Power

Built for the build schedule.

Data center timelines can not wait on a 40-week equipment delay. We are here to ensure that doesn't happen.

  • SalesSend the one-line or the nameplate for a quote in < 30 minutes.
  • EngineeringOur engineers turn the quote into approval drawings and submittals.
  • Projects Your project manager reports manufacturing progress every week until the unit ships.
  • LogisticsIn-house desk schedules boats, trucks, and delivery windows.
  • Post SalesBet Power supports startup, testing, and field installation.

Customer stories

Numbers from the field.

Outcomes from data center builds that needed a unit on the pad on schedule.

85 MW of Padmount Transformers

34 custom built 2500 kVA padmount units staged and set for our hyperscale client in Texas.

Skidded Solutions

MV transformers, UL891 Switchboards, and MV Switchgear all engineered, fabricated, and packaged in-house.

Let's Build Together, Today.